There are a million and one factors to take into consideration when planning a new brewery or expansion and an equal number of solutions out there for each one. At Sky Agro we are dedicated to using our experience and expertise to cut through the noise and help find the very best solution for our customer’s needs.
The Sky Tech team knows first-hand that whilst some things can be decided on the go, others need decisions need immediate thought whilst putting the project specifications together. Here are some of the most common questions to think about when planning a new brewhouse project:
What batch size are you looking to produce and what is your intended annual production?
You will want to be able to complete your annual production comfortably allowing flexibility for both planned and unplanned stoppages throughout the year, so ensuring your equipment is of a good size and calibrated to accommodate this is paramount.
How many different products do you intend to produce?
This doesn’t need to be pinpoint accurate, but over 10 is usually considered high-volume. If this is the case, you will need to consider the smallest batch size you would wish to produce to meet your demand.
How many members of production staff do you have?
In the first instance, many small breweries start with 1 – 2 production staff but often expand rapidly. The plant will need to be the correct size to complete the required production with both your current and future staffing capacities taken into account.
Future plans. What flexibility will be required of the brewery plant?
You may wish to start at 2 – 3 brews per week, but over the life of the plant, your plans could stretch anywhere up to multiple brews daily, which would be best served by a multi-vessel brewhouse, allowing you to more regularly mash in.
What types of beer and what ingredients will you use?
Different configurations suit different beers: Temperature stepped mashing is helpful in handling non-malted grains and measurable fermentability control, an oversized mash tun will help greatly with high-gravity beers, whereas a separate whirlpool may be effective where high hop loads are deployed etc. Planning for these in advance can help alleviate any potential bottle-necks down the line once up and running.
Choice of Water System
The best water system for your project will depend on your immediate needs, but make sure it doesn’t tie you into a system that does not allow for potential growth down the line.
For smaller systems, where ambient water storage is available: The most efficient system is a two-stage heat exchanger with ambient and glycol tanks, running to an HLT at 1.5 – 2x brewlength.
With larger production systems it will vary based on the number of brews per day as follows:
For brewing once per day: HLT=1.5x brewlength with CLT=1.2x brewlength is adequate.
For multiple brews per day: HLT=3x brewlength with CLT=2x brewlength is more standard.
Whatever your needs, our specialist Sky Tech engineers will work with you to identify the best solution for your business’ needs both now and going forwards. From our free of charge process audits, bespoke equipment offerings and technical project management throughout, through to our dedicated aftercare services, sky’s the limit when it comes to making sure our customers equipment and technology needs are met.
Get in touch HERE to speak to. member of the team about your project.